Optimizing Operations And Supply Chain Performance: Implementation Of Total Productive Maintenance (TPM) To Reduce Lead Time In An Indonesian Telecommunication Equipment Company
DOI:
https://doi.org/10.31004/sicedu.v5i3.1562Keywords:
Operations Management, Supply Chain Resilience, Total Productive Maintenance (TPM), Lead Time Reduction, Lean Operations, Electronics Industry.Abstract
In the modern era of intense industrial competition, manufacturing organizations must continuously optimize their operations and supply chain performance to meet rapidly changing market demands. Electronic and telecommunication equipment manufacturers invest heavily in automated machinery to maintain high output. However, frequent equipment breakdowns severely inflate production lead times and disrupt downstream supply chain schedules. This study evaluates the implementation of Total Productive Maintenance (TPM) lean tools to reduce machine downtime and total lead time in a leading Indonesian telecommunication equipment manufacturer located in West Java. A structured six-month ground study was conducted on a production line to establish baseline equipment performance, followed by Pareto breakdown analysis, root cause identification, and the execution of autonomous and planned maintenance protocols. The empirical results demonstrate a 78.2% reduction in monthly machine breakdown hours, dropping from a baseline average of 117.6 hours to 25.6 hours per month. This improvement far exceeded the company's initial 40% downtime reduction target, stabilizing line throughput, eliminating workforce idle time, and significantly enhancing overall supply chain responsiveness. The average production lead was estimated to decrease from approximately 14 days before TPM implementation to 9 days after implementation, representing a 35.7% reduction. The findings provide operational managers with a validated blueprint for combining proactive maintenance with lean supply chain strategies in high-tech manufacturing environments.






